Advance FTE Requirement Calculator
What is FTE?
FTE (Full-Time Equivalent) helps to know how many full-time employees are needed to handle the workload based on time, volume, and work efficiency.
Example Case Study
If you receive 1,000 calls a day and each call takes 300 seconds (5 minutes), with an occupancy of 85% and shrinkage of 25%, and your agents work 8 hours a day:
- Workload in seconds = 1,000 × 300 = 300,000 seconds
- Total working time in seconds per agent = 8 × 60 × 60 × 0.85 × (1 – 0.25) = 18,360 seconds
- FTE Required = 300,000 ÷ 18,360 ≈ 16.34 agents